Daikin AC FTXS09LVJU ; FTXS12LVJU ; CTXS07LVJU

This Operation manual is for
SkyAir – Multi-Split Systems.

MODELS: FTXS09LVJU ; FTXS12LVJU ; CTXS07LVJU
 

• Read safety considerations for operations carefully before installing air conditioning equipment. After completing the installation, make sure that the unit operates properly during the startup operation. Instruct the customer on how to operate and maintain the unit.
Inform customers that they should store this operation manual with the installation manual for future reference.
Meanings of DANGER, WARNING, CAUTION, and NOTE Symbols.

This Manual is translated into these languages: English, Français, Español.

CONTENTS:

    READ BEFORE OPERATION

  • Safety Precautions … Page 3
  • Names of Parts … Page 5
  • Preparation before Operation … Page 9
  • OPERATION

  • AUTO · DRY · COOL · HEAT · FAN Operation … Page 11
  • Adjusting the Airflow Direction and Rate … Page 13
  • COMFORT AIRFLOW / INTELLIGENT EYE Operation … Page 15
  • POWERFUL Operation … Page 17
  • OUTDOOR UNIT QUIET Operation … Page 18
  • ECONO Operation … Page 19
  • OFF TIMER Operation … Page 20
  • ON TIMER Operation … Page 21
  • WEEKLY TIMER Operation … Page 22
  • Multi Connection

  • Note for Multi System … Page 28
  • Care

  • Care and Cleaning … Page 30
  • Troubleshooting

  • Troubleshooting … Page 35